Skip to content

Melbourne and regional Victoria

Bathrooms, laundries and toilets waterproofed at the falls, junctions and waste outlets that decide whether a wet area holds water.

Bathrooms, showers and laundries are wet areas, and a wet area fails at its weak points, not in the middle of the floor. The waste outlet, the wall and floor junction, the corner where a shower screen sits and the penetrations for taps and drains are where water finds a way through. Shieldmate Waterproofing waterproofs bathrooms, laundries and toilets with those points in mind. Each job starts with the substrate: is it sound, is it dry enough to coat, and do the falls run to the waste? If the falls are wrong, no membrane will fix the ponding, so we check them before anything is applied.

Our wet area work is built up in layers. Corners and junctions get bond breakers or reinforcing fabric so the membrane can flex with the building instead of tearing at the joint. Puddle flanges sit at the waste outlet so the membrane is bonded to the drain and not just painted around it. The membrane goes on in coats, and each coat is allowed to cure before the next. Tiles go down only after the membrane has cured and passed a flood test, which means the room is filled to the set level and left to show whether anything gets through into the floor below.

Membranes are chosen for the substrate and the finish. Liquid-applied polyurethane and acrylic membranes suit most bathrooms and laundries, and they can be taken up the wall to the height the detail requires. Sheet membranes are used where the detail calls for a fixed layer, such as some hobs and upstands. Every membrane needs to go on at the thickness its maker specifies, with the cure time respected. Rushing the cure is one of the most common reasons a good membrane fails. If you are building or renovating, tell us the wall and floor materials, the shower layout and what is going on top, and we will say which approach suits the room.

Section detail

Section detail: wet area waterproofing01 Substrate. Concrete checked for soundness, moisture and falls before anything is applied. 02 Primer. Seals the substrate so the screed bonds to it. 03 Screed. Mortar bed laid to fall to the waste, so water runs off rather than ponding. 04 Bond breaker. Fillet in the wall and floor junction, set on the screed, so the membrane can bridge the corner without tearing. 05 Membrane. Liquid-applied membrane follows the falls, turns up the wall and bridges the fillet. 06 Tile and adhesive. Tiles go down only after the membrane has cured and passed a flood test.060504030201
  1. 01Substrate

    Concrete checked for soundness, moisture and falls before anything is applied.

  2. 02Primer

    Seals the substrate so the screed bonds to it.

  3. 03Screed

    Mortar bed laid to fall to the waste, so water runs off rather than ponding.

  4. 04Bond breaker

    Fillet in the wall and floor junction, set on the screed, so the membrane can bridge the corner without tearing.

  5. 05Membrane

    Liquid-applied membrane follows the falls, turns up the wall and bridges the fillet.

  6. 06Tile and adhesive

    Tiles go down only after the membrane has cured and passed a flood test.

Scope

What’s included

  1. 1Surface check of the substrate, its moisture and the falls to waste
  2. 2Crack and junction treatment with bond breakers or reinforcing fabric where needed
  3. 3Puddle flange fitted at the waste outlet
  4. 4Membrane applied in coats to the thickness the membrane maker specifies
  5. 5Upstands and terminations up the walls and over thresholds
  6. 6Flood test before tiles or screed go down

Membranes

Membrane types

Membranes are named by type, not by brand. The right type depends on the substrate, the exposure and the finish.

  • Liquid-applied polyurethane
  • Liquid-applied acrylic
  • Sheet membrane at hobs, upstands and fixed details

Process

How the job runs

The steps in order, from the first call.

  1. 1

    Tell us about the job

    Call 0488 213 088, email shieldmatewaterproofing@gmail.com, or send the form on the contact page. Tell us the area, what is there now and what you are planning.

  2. 2

    We look at the site

    We check the substrate, the falls, the outlets, the junctions and any existing membrane. Where there is a leak, we trace the water path before we recommend a repair.

  3. 3

    We explain what it needs

    You get the scope in plain terms: the membrane, the detailing and the order the work happens in. If there is more than one sensible option, we set them out.

  4. 4

    We prepare and coat

    The surface is cleaned, repaired and dried. Junctions and outlets are detailed first, then the membrane goes on in coats, with each coat cured before the next.

  5. 5

    We test before finishing

    The area is flood tested before tiles, pavers or screed go over the membrane. Finishing starts only once the membrane has cured and held the water.

Shower recess with grey waterproofing on the walls and floor tray, before tiling

Questions

Common questions

Do you waterproof laundries and toilets as well as showers?

Yes. Laundries and toilets get the same surface check, junction treatment and flood test as a shower. How far the membrane runs depends on the room layout, which is why we look at it before we quote.

How long before I can tile over a new membrane?

It depends on the membrane, the thickness applied, and the temperature and humidity in the room. Follow the cure time on the product data sheet. Do not tile until the membrane has cured and passed a flood test.

Is a flood test really needed?

In our view, yes. A flood test fills the room to the set level and holds it there for a set period, so a leak shows up before tiles and screed hide it. Testing is much easier to do before the room is finished.

All questions

Quote

Request a quote

Tell us the suburb, what is there now and what you are planning.

All fields are required.

We only use your details to reply to this request. See our privacy policy.

Talk to us

Tell us about the job

Call, email or send the quote form. Tell us the suburb, what is there now and what you are planning.

Email shieldmatewaterproofing@gmail.com