Guide
How to Prepare Substrates for Waterproofing
How to prepare concrete, timber-based sheets and screeds before a liquid membrane goes on: clean, dry, sound and primed, and what to check.
2 min readUpdated
A membrane is only as good as the surface it bonds to. Most wet area membrane failures start with preparation rather than with the product itself. This guide covers the steps for concrete, timber-based sheets and screeds: clean, dry, sound and primed.
1. Clean the surface
Sweeping is not enough. Fine dust stops the primer soaking in and the membrane bonding. Remove paint splashes, tile adhesive, grease, drywall compound and curing compounds, using the method the membrane maker recommends. Grinding and scraping are common. Vacuum the surface thoroughly before priming.
2. Check the moisture
Do not coat a wet surface. Moisture trapped under a membrane can push bubbles through it as the surface warms, and the bond can fail. Check the moisture limit in the membrane maker's data sheet, and let new concrete and screeds cure for the period the supplier or builder specifies.
3. Make sure the base is stable
A membrane and its tiles need a base that does not move. Timber-based floors are usually sheeted with a rigid underlay before waterproofing. Fix and seal the sheets as the underlay maker and the membrane maker direct. The NCC Housing Provisions Part 10.2 refers to AS 3740 for wet area construction, and the standard sets out the detail.
4. Prime
Porous surfaces, including concrete, screed, fibre cement and timber, can draw moisture and solvents out of the membrane before it cures. Use the primer the membrane maker specifies. Primers seal the surface and help the membrane bond.
Concrete
Grind off any laitance, the weak cement layer on the surface, and expose sound concrete. Repair cracks and voids with a patching product that the membrane maker approves.
Timber and sheet substrates
Check that fixings are flush or countersunk. Seal sheet joints and reinforce them as the maker directs, then prime. Timber moves with moisture, which is why the sheet layer and the joint treatment matter.
Screeds and mortar beds
Screeds hold a lot of moisture. Let them cure for the time the supplier specifies, then vacuum loose sand so the membrane can bond.
What to ask your waterproofer
Ask what they will check before they start, how they will prepare each surface, and which primer and membrane they will use. Ask for the data sheets. The wet area waterproofing and screed shower bases service pages describe the work on these surfaces.
Services
Related services
The services that cover the work in this guide.
- Wet area waterproofingBathrooms, laundries and toilets waterproofed at the falls, junctions and waste outlets that decide whether a wet area holds water.
- Retaining wall waterproofingRetaining and below-ground walls waterproofed with a membrane and a drainage path that takes soil water away before it builds up.
- Screed shower bases and balconiesScreed shower bases and balcony screeds built with the falls, membrane and waste detail that keep water in the drain.
Guides
Related guides
Longer reading on the membranes, details and standards behind this work.
- Why Detail Matters in Balcony WaterproofingHow to waterproof a balcony so it stays dry: the junctions, outlets, falls and penetrations to check before tiles or screed go down.
- Navigating the National Construction Code (NCC) for WaterproofingHow NCC 2025, the Housing Provisions and AS 3740 fit together for waterproofing wet areas in Victoria, with the wet area heights and floor waste fall.
- The Dangers of DIY Waterproofing in VictoriaThinking of waterproofing a bathroom yourself in Victoria? Check the permit, registration and insurance rules before you start, and get advice first.