Melbourne and regional Victoria
Balconies and terraces waterproofed so water runs to the outlets and stays off the structure and the ceiling below.
A balcony is a roof over someone else's living room. The membrane under the tiles or pavers is the only thing stopping water getting into the slab, the wall junction and the ceiling below. Balcony failures are common because water ends up in the wrong place. A fall runs back toward the building, an outlet is blocked or set too high, or a membrane stops at the door threshold instead of carrying up the wall. Shieldmate Waterproofing treats the balcony as a drained surface first and a waterproof surface second.
Our work starts with the falls. The surface has to slope to the outlets, and the outlets have to be clear and set at the right level. We check the existing drainage, the threshold and the balustrade fixings, and look for cracks or old sealant that will need treatment. Outlets get puddle flanges so the membrane is bonded to the drain body. At the door threshold and along the wall, the membrane is taken up as an upstand and terminated so water cannot run behind it. Where the balcony meets the wall, a bond breaker or flexible sealant stops movement in the slab from splitting the membrane.
The membrane is applied in coats. Each coat has to cure before the next goes on, and the cure time depends on the product and the weather. Tiles, pavers or a screed topping go down only after the membrane has cured. Before anything is finished over it, we flood test the balcony by blocking the outlets and filling it to the set level, then checking the ceiling below and the slab edge for any sign of water. If a balcony is already leaking, we investigate the source before recommending a fix, because the cause is often not where the stain is.
Section detail
- 01Substrate
Structural slab, with the door hob built up at the threshold.
- 02Primer
Seals the slab for the screed.
- 03Screed
Screed laid to fall one way, so water runs off the balcony toward the waste.
- 04Membrane
Membrane follows the falls on top of the screed, turned up the face of the hob.
- 05Puddle flange
Membrane flange bonded around the waste so the outlet is sealed to the membrane.
- 06Fall to waste
The fall runs in one direction, toward the waste outlet.
Scope
What’s included
- 1Falls checked, with screed levelling where the falls need it
- 2Outlet and puddle flange work
- 3Upstands and threshold terminations
- 4Bond breaker or flexible sealant at the wall junction
- 5Membrane applied in coats, cured between coats
- 6Flood test before the finish goes down
Membranes
Membrane types
Membranes are named by type, not by brand. The right type depends on the substrate, the exposure and the finish.
- Liquid-applied polyurethane
- Liquid-applied acrylic
- Sheet membrane at upstands and detail areas
Standards
Standards and references
Official sources for the standards and rules that apply to this work.
Process
How the job runs
The steps in order, from the first call.
- 1
Tell us about the job
Call 0488 213 088, email shieldmatewaterproofing@
gmail.com, or send the form on the contact page. Tell us the area, what is there now and what you are planning. - 2
We look at the site
We check the substrate, the falls, the outlets, the junctions and any existing membrane. Where there is a leak, we trace the water path before we recommend a repair.
- 3
We explain what it needs
You get the scope in plain terms: the membrane, the detailing and the order the work happens in. If there is more than one sensible option, we set them out.
- 4
We prepare and coat
The surface is cleaned, repaired and dried. Junctions and outlets are detailed first, then the membrane goes on in coats, with each coat cured before the next.
- 5
We test before finishing
The area is flood tested before tiles, pavers or screed go over the membrane. Finishing starts only once the membrane has cured and held the water.
Questions
Common questions
Can you waterproof a balcony that already has tiles on it?
Sometimes. Tiles can stay where they are sound and bonded, but the membrane underneath has to be checked, and the outlets and junctions have to be reachable. Often the tiles come up around the outlets and along the threshold. We will tell you what we find before any work starts.
Why does my balcony leak at the door?
Usually the membrane stops short of the threshold, or the threshold sits below the finished membrane level, so water runs under the door track. Fixing it means carrying the membrane up and over the threshold and terminating the upstand correctly.
How long should I wait before walking on a new balcony membrane?
Walk on it only when the membrane has cured under the conditions it was applied in, and the product data sheet allows it. Keep traffic off the wet membrane, and protect it from dropped tools and planter boxes until the cure is complete.
Guides
Related guides
Longer reading on the membranes, details and standards behind this work.
- Why Detail Matters in Balcony WaterproofingHow to waterproof a balcony so it stays dry: the junctions, outlets, falls and penetrations to check before tiles or screed go down.
- Common Balcony Waterproofing Failures in Melbourne (And How to Prevent Them)Why balconies leak in Melbourne: ponding water, the wrong membrane, failed junctions and efflorescence, and what to check before tiling.
- Waterproofing Terminations and Hobs: Getting the Details RightWhere waterproofing must end at doorways, hobs and walls in a bathroom, with the minimum shower and bath wall heights from the NCC Housing Provisions.
- Understanding Waterproofing Membranes: A Guide for HomeownersThe main membrane types for homes, liquid-applied and sheet, where each one suits, and why surface preparation decides how well either performs.
Quote
Request a quote
Tell us the suburb, what is there now and what you are planning.