Independent inspections of waterproofing before it is covered, or of existing work that is in question.

An independent inspection looks at waterproofing without being the trade that installed it. That matters because most waterproofing is covered within days of being applied. Tiles, screed and cladding hide the membrane, and any fault underneath stays hidden until water shows up somewhere else. An inspection before covering, or a check of existing work, gives owners and buyers a clear view of what is actually there. Once the area is covered, the only way to see the membrane is to break the finish open.

What we look at depends on the job. For a new bathroom, balcony or shower base, we check the substrate, the falls, the outlets, the bond breakers at junctions, the coverage and thickness of the membrane, and the terminations up the walls and over thresholds. For an existing area, we look for signs of failure such as cracking at junctions, staining, soft substrate and failed sealant, and work out the likely cause. We note what could be seen and what could not, so you know where the gaps in the check are. Where the membrane is hidden and cannot be checked, the findings say so.

An inspection tells you what is there and what it would take to put it right. It is not a repair. Owners ask for one before buying a property, when a dispute starts, or before a balcony or bathroom is re-tiled. If you are not sure whether an inspection is the right step, call 0488 213 088 and describe what you have seen.

Section detail

Section detail: waterproofing inspection01 Substrate. Slab and walls, checked before any test is run. 02 Primer. Primes the slab for the screed. 03 Screed. Floor screed laid over the primer. 04 Floor moisture. Moisture read in the screed before the flood test. 05 Membrane. Membrane carried up the walls, with its upturn above the test level. 06 Flange check. Waste and membrane flange, checked for leaks during the test. 07 Tile. Floor tiles, set after the membrane has cured. 08 Flood test level. Room filled to the set level, kept below the top of the upturn. 09 Upturn check. Membrane upturn checked above the flood level, so a leak shows at the wall.FLOOD DEPTH090807060504030201
  1. 01Substrate

    Slab and walls, checked before any test is run.

  2. 02Primer

    Primes the slab for the screed.

  3. 03Screed

    Floor screed laid over the primer.

  4. 04Floor moisture

    Moisture read in the screed before the flood test.

  5. 05Membrane

    Membrane carried up the walls, with its upturn above the test level.

  6. 06Flange check

    Waste and membrane flange, checked for leaks during the test.

  7. 07Tile

    Floor tiles, set after the membrane has cured.

  8. 08Flood test level

    Room filled to the set level, kept below the top of the upturn.

  9. 09Upturn check

    Membrane upturn checked above the flood level, so a leak shows at the wall.

Scope

What’s included

  1. 1Pre-cover inspection of new membranes
  2. 2Assessment of existing waterproofing
  3. 3Check of falls, outlets and junctions
  4. 4Notes on what could and could not be seen
  5. 5Advice on the likely cause and the options
  6. 6Findings explained in plain language

Membranes

Membrane types

Membranes are named by type, not by brand. The right type depends on the substrate, the exposure and the finish.

  • Liquid-applied polyurethane
  • Liquid-applied acrylic
  • Sheet membrane

Standards

Standards and references

Official sources for the standards and rules that apply to this work.

Process

How the job runs

The steps in order, from the first call.

  1. 1

    Tell us what you need

    Tell us whether the work is new and not yet covered, or existing work that is in question. Call 0488 213 088 or email shieldmatewaterproofing@gmail.com, and describe what you have seen.

  2. 2

    We check what can be seen

    For a new bathroom, balcony or shower base we check the substrate, the falls, the outlets, the bond breakers at junctions, the coverage and thickness of the membrane, and the terminations. For existing work we look for cracking at junctions, staining, soft substrate and failed sealant.

  3. 3

    We note what could not be seen

    We record what could be seen and what could not, so you know where the gaps in the check are. Where the membrane is hidden and cannot be checked, the findings say so.

  4. 4

    We explain the likely cause

    We set out the likely cause and the options to put it right, in plain language. An inspection tells you what is there. It is not a repair.

Questions

Common questions

Can you inspect waterproofing before the tiles go down?

Yes. A pre-cover inspection is the best time to check the membrane, falls and junctions, because the work can still be seen. Call us before the tiler or screeder is booked.

I am buying a property. Is a waterproofing inspection worth it?

That is your decision. An inspection shows the condition of the waterproofing we can see, on the day we inspect. It does not cover parts of the building we cannot access.

Do you give legal advice on a building dispute?

No. We look at the waterproofing and report what we find. For a building dispute, Consumer Affairs Victoria sets out the steps to take, and a lawyer can advise on the legal side.

All questions

Quote

Request a quote

Tell us the suburb, what is there now and what you are planning.

All fields are required.

We only use your details to reply to this request. See our privacy policy.

Talk to us

Tell us about the job

Call, email or send the quote form. Tell us the suburb, what is there now and what you are planning.

Email shieldmatewaterproofing@gmail.com