Screed shower bases and balcony screeds built with the falls, membrane and waste detail that keep water in the drain.

A screed shower base is a sloped bed of mortar that sits on the floor and carries water to the waste. The falls in that bed are most of the job. If the fall is too flat, water sits on the tiles and finds the joints. If it is too steep, the floor is uncomfortable to stand on. Shieldmate Waterproofing builds the waterproofing under screed shower bases and balcony screeds with the falls and the waste outlet treated as one system.

The membrane goes under or over the screed depending on the design, and the detail matters at every edge. Where the membrane sits, above or below the screed, is set by the standard that applies to the job, so check that detail with us before the bed goes in. Bond breakers are placed where the screed meets the wall and the floor, so the bed can move without pulling the membrane away from the junction. A puddle flange is fitted at the waste so the membrane is bonded to the outlet body. Where the membrane meets the wall it is carried up to the height the detail requires, and the terminations are sealed so water cannot run behind them.

Screed needs time before the membrane goes on and before tiles go down. The substrate has to be sound and dry enough for the membrane to bond, and the screed itself has to cure before anything is laid over it. We follow the cure times on the product data sheets and do not rush the sequence. Once the membrane has cured, the base is flood tested by blocking the waste and filling it to the set level. A flat fall, a leaking flange or a poor termination shows up in that test, which is the reason to run it.

Section detail

Section detail: shower base waterproofing01 Substrate. Structural slab prepared to receive the screed. 02 Primer. Primes the slab before the screed goes on. 03 Hob. Concrete hob at the shower entry, a step down from the room floor. 04 Screed. Screed falls from both sides to the waste at the low point. 05 Membrane. Membrane wraps over the hob top, down its outer face, and follows the falls. 06 Puddle flange. Membrane flange bonded around the waste outlet. 07 Tile and adhesive. Tiles set flush with the grate at the waste, so water reaches the outlet.07060504030201
  1. 01Substrate

    Structural slab prepared to receive the screed.

  2. 02Primer

    Primes the slab before the screed goes on.

  3. 03Hob

    Concrete hob at the shower entry, a step down from the room floor.

  4. 04Screed

    Screed falls from both sides to the waste at the low point.

  5. 05Membrane

    Membrane wraps over the hob top, down its outer face, and follows the falls.

  6. 06Puddle flange

    Membrane flange bonded around the waste outlet.

  7. 07Tile and adhesive

    Tiles set flush with the grate at the waste, so water reaches the outlet.

Scope

What’s included

  1. 1Falls to waste set in the screed bed
  2. 2Puddle flange at the waste outlet
  3. 3Bond breakers at the wall and floor junctions
  4. 4Membrane above or below the screed, as the detail requires
  5. 5Terminations up the wall sealed
  6. 6Cure time respected before tiling
  7. 7Flood test before tiles go down

Membranes

Membrane types

Membranes are named by type, not by brand. The right type depends on the substrate, the exposure and the finish.

  • Liquid-applied polyurethane
  • Liquid-applied acrylic
  • Sheet membrane at the waste and junctions

Process

How the job runs

The steps in order, from the first call.

  1. 1

    Tell us about the job

    Call 0488 213 088, email shieldmatewaterproofing@gmail.com, or send the form on the contact page. Tell us the area, what is there now and what you are planning.

  2. 2

    We look at the site

    We check the substrate, the falls, the outlets, the junctions and any existing membrane. Where there is a leak, we trace the water path before we recommend a repair.

  3. 3

    We explain what it needs

    You get the scope in plain terms: the membrane, the detailing and the order the work happens in. If there is more than one sensible option, we set them out.

  4. 4

    We prepare and coat

    The surface is cleaned, repaired and dried. Junctions and outlets are detailed first, then the membrane goes on in coats, with each coat cured before the next.

  5. 5

    We test before finishing

    The area is flood tested before tiles, pavers or screed go over the membrane. Finishing starts only once the membrane has cured and held the water.

Questions

Common questions

How much fall does a shower base need?

The fall is set by the design and the standard that applies. We check it against the plan before the screed is laid. Water sitting in the base after the flood test is a sign that the fall or the outlet level is wrong.

Can you waterproof a screed balcony?

Yes. Balcony screeds use the same falls, outlet and junction detail as a shower base, with a membrane suited to the exposure outside.

Why is the grout cracking at the wall on my shower base?

Cracked grout at the wall junction often points to movement with no bond breaker or flexible sealant at that joint. It can also come from a bed that was tiled before it had cured.

All questions

Quote

Request a quote

Tell us the suburb, what is there now and what you are planning.

All fields are required.

We only use your details to reply to this request. See our privacy policy.

Talk to us

Tell us about the job

Call, email or send the quote form. Tell us the suburb, what is there now and what you are planning.

Email shieldmatewaterproofing@gmail.com