Guide
The Importance of Bond Breakers in Australian Construction
What a bond breaker is, why a waterproofing membrane tears at a wall-to-floor junction without one, and what the NCC says about wet areas.
2 min readUpdated
A bond breaker is a small detail that stops a waterproofing membrane tearing in a corner. It is easy to overlook, and it is one of the first things to check on a wet area job.
Buildings move
Timber framing shrinks as it dries, floors settle, and concrete changes with temperature. Movement is normal, but it concentrates where one part of the building meets another, such as a floor meeting a wall.
The tear
Imagine a membrane bonded tightly into a 90-degree corner where a floor meets a wall. When the floor settles or the wall shifts, the corner changes shape. The membrane is pulled two ways at once, and it can split along the corner. Water then finds the split.
The bond breaker
A bond breaker creates a de-bonded zone at the corner, so the membrane can stretch over the gap instead of being pulled apart. Methods include a flexible sealant or a bond breaker tape. The method, and the width of the de-bonded zone, should follow the membrane maker's instructions and the standard. This guide does not give a width.
What the rules say
The NCC Housing Provisions, Part 10.2, refers to AS 3740 for wet area construction. AS 3740 is the standard to check for junction details. It is paywalled, so this guide does not quote it; its store page lists the edition. Ask your waterproofer which bond breaker method they use and where it is installed.
Summary
Do not accept "the membrane is flexible enough" as a reason to skip a bond breaker. Flexibility helps, but a membrane bonded rigidly into a moving corner can still tear. Ask the waterproofer to show the junction detail before tiling. Our wet area waterproofing service covers junction treatment as part of the work.
Services
Related services
The services that cover the work in this guide.
- Wet area waterproofingBathrooms, laundries and toilets waterproofed at the falls, junctions and waste outlets that decide whether a wet area holds water.
- Retaining wall waterproofingRetaining and below-ground walls waterproofed with a membrane and a drainage path that takes soil water away before it builds up.
- Screed shower bases and balconiesScreed shower bases and balcony screeds built with the falls, membrane and waste detail that keep water in the drain.
Guides
Related guides
Longer reading on the membranes, details and standards behind this work.
- How to Prepare Substrates for WaterproofingHow to prepare concrete, timber-based sheets and screeds before a liquid membrane goes on: clean, dry, sound and primed, and what to check.
- Why Detail Matters in Balcony WaterproofingHow to waterproof a balcony so it stays dry: the junctions, outlets, falls and penetrations to check before tiles or screed go down.
- Navigating the National Construction Code (NCC) for WaterproofingHow NCC 2025, the Housing Provisions and AS 3740 fit together for waterproofing wet areas in Victoria, with the wet area heights and floor waste fall.