Skip to content

Commercial and industrial

Commercial and industrial waterproofing in Melbourne and regional Victoria: external surfaces, balconies, wet areas and inspections.

Commercial and industrial buildings put more pressure on waterproofing than most homes. Surfaces carry more traffic, drains are larger and harder to reach, and a leak can stop a business or damage stock and plant. Shieldmate Waterproofing does commercial and industrial waterproofing across Melbourne and regional Victoria, covering external surfaces, balconies, wet areas and retaining walls.

The approach is the same as for homes, scaled to the job. We start with the falls, the drainage and the substrate, then detail the junctions and penetrations, and apply the membrane in coats with the cure respected. On a building that is in use, the inspection step matters more, because the work can be covered quickly and the next fault can be hard to reach. Tell us the access, the working hours and any constraints when you get in touch, so the work can be planned around them.

Work

Work we do

  1. 1External and podium surfaces
  2. 2Balconies and terraces
  3. 3Commercial wet areas
  4. 4Retaining and below-ground walls
  5. 5Independent inspections before covering
  6. 6Leak investigation and remedial work

Process

How the job runs

The steps in order, from the first call.

  1. 1

    Tell us about the job

    Call 0488 213 088, email shieldmatewaterproofing@gmail.com, or send the form on the contact page. Tell us the area, what is there now and what you are planning.

  2. 2

    We look at the site

    We check the substrate, the falls, the outlets, the junctions and any existing membrane. Where there is a leak, we trace the water path before we recommend a repair.

  3. 3

    We explain what it needs

    You get the scope in plain terms: the membrane, the detailing and the order the work happens in. If there is more than one sensible option, we set them out.

  4. 4

    We prepare and coat

    The surface is cleaned, repaired and dried. Junctions and outlets are detailed first, then the membrane goes on in coats, with each coat cured before the next.

  5. 5

    We test before finishing

    The area is flood tested before tiles, pavers or screed go over the membrane. Finishing starts only once the membrane has cured and held the water.

Talk to us

Tell us about the job

Call, email or send the quote form. Tell us the suburb, what is there now and what you are planning.

Email shieldmatewaterproofing@gmail.com