Skip to content

Melbourne and regional Victoria

Above-ground external surfaces waterproofed so water drains away from the structure and the walls it meets.

External waterproofing covers surfaces exposed to weather and to water running off them: planter boxes, podiums, walkways, and the slabs and planters that sit against the building. The aim is the same as anywhere else. Stop water getting into the structure, and keep it moving to a drain. Planter boxes show the problem clearly. Soil and watering hold moisture against the walls, so the membrane has to run up the wall behind the box and terminate above the soil line, and the drain holes have to work.

Our external work starts with the drainage and the falls. A surface that holds water will leak eventually, however good the membrane. We check the grades, the outlets, any existing waterproofing and the way water runs off the building. Joints, penetrations and the junction between the planter or podium and the wall are detailed with bond breakers, reinforcing fabric or sealant as the detail requires. Where a membrane is applied, it goes on in coats, each cured before the next, and it is protected from traffic and dropped material until it is covered.

Membranes for external above-ground use have to handle sun, temperature change and foot traffic. Liquid-applied polyurethane and acrylic membranes are common on external surfaces, and sheet membranes are used at upstands and detail areas. The membrane has to suit the exposure, and the finish, whether tiles, pavers or a topping, has to go over it without damaging it. Any external job should be checked against the standard that applies to the membrane and its use. We are happy to talk that through before work begins.

Section detail

Section detail: external waterproofing01 Substrate. Podium slab or planter base, sound and laid to falls. 02 Primer. Primes the slab for the membrane. 03 Membrane. Membrane turned up the planter walls to the detail height. 04 Protection board. Rigid board protects the membrane from the drainage layer and the planting. 05 Drainage layer. Dimpled drainage board carries excess water to the outlet. 06 Planting media. Growing medium sits above the drainage layer, away from the membrane.060504030201
  1. 01Substrate

    Podium slab or planter base, sound and laid to falls.

  2. 02Primer

    Primes the slab for the membrane.

  3. 03Membrane

    Membrane turned up the planter walls to the detail height.

  4. 04Protection board

    Rigid board protects the membrane from the drainage layer and the planting.

  5. 05Drainage layer

    Dimpled drainage board carries excess water to the outlet.

  6. 06Planting media

    Growing medium sits above the drainage layer, away from the membrane.

Scope

What’s included

  1. 1Drainage and falls checked before coating
  2. 2Membrane on planters, podiums or external slabs
  3. 3Junction and penetration detailing
  4. 4Upstands and terminations above the soil or finished level
  5. 5Coats applied and cured between coats
  6. 6Membrane protected until it is covered
  7. 7Advice on finishes over the membrane

Membranes

Membrane types

Membranes are named by type, not by brand. The right type depends on the substrate, the exposure and the finish.

  • Liquid-applied polyurethane
  • Liquid-applied acrylic
  • Sheet membrane at upstands

Process

How the job runs

The steps in order, from the first call.

  1. 1

    Tell us about the job

    Call 0488 213 088, email shieldmatewaterproofing@gmail.com, or send the form on the contact page. Tell us the area, what is there now and what you are planning.

  2. 2

    We look at the site

    We check the substrate, the falls, the outlets, the junctions and any existing membrane. Where there is a leak, we trace the water path before we recommend a repair.

  3. 3

    We explain what it needs

    You get the scope in plain terms: the membrane, the detailing and the order the work happens in. If there is more than one sensible option, we set them out.

  4. 4

    We prepare and coat

    The surface is cleaned, repaired and dried. Junctions and outlets are detailed first, then the membrane goes on in coats, with each coat cured before the next.

  5. 5

    We test before finishing

    The area is flood tested before tiles, pavers or screed go over the membrane. Finishing starts only once the membrane has cured and held the water.

Questions

Common questions

Can you waterproof a planter box against the house wall?

Yes. The membrane runs up the wall behind the planter and across its base, and the top edge is terminated so water cannot get behind it. Drain holes and the base are checked as part of the job.

What happens if the membrane is walked on too soon?

It can be scuffed, punctured or pulled away from the surface while it is still curing. Damage like that often leaks in a place you cannot see. Keep traffic off until the cure is complete.

Do you do podium and walkway waterproofing?

Yes, where the surface is external and above ground. Tell us the structure, the finish you plan and where the water is going, and we will say what the job involves.

All questions

Quote

Request a quote

Tell us the suburb, what is there now and what you are planning.

All fields are required.

We only use your details to reply to this request. See our privacy policy.

Talk to us

Tell us about the job

Call, email or send the quote form. Tell us the suburb, what is there now and what you are planning.

Email shieldmatewaterproofing@gmail.com